Skip to content
The NewsGuild – TNG-CWA

The NewsGuild – TNG-CWA

Representing journalists, media workers and other activists

  • About
    • Members
    • Leadership
    • Staff
    • Locals
    • History
    • Pension
    • Constitution
  • News
  • Events
  • Issues
    • Your Workplace Rights
    • Legislation
    • Pay Equity
    • Sexual Harassment
  • Unionize
  • Contact
  • Store
Search

ColorOfChangeUnion

Posted on September 24, 2024September 24, 2024Full size 1200 × 800

The image shows a stylized logo with the words "Color of Change Union" in black, forming an arc over a raised fist in black. The raised fist, a common symbol of solidarity and resistance, is surrounded by a half-circle of colored segments, ranging from red to yellow, symbolizing a gradient of change or diversity. The color gradient gives the design a dynamic feel, emphasizing empowerment and unity.

Post navigation

Previous Previous post: Color Of Change ordered to reinstate illegally laid off workers and pay back wages after NLRB Ruling

Subscribe to our newsletter

Recent Posts

  • Buffalo History Museum event postponed after threats of violence were made against Buffalo News editorial cartoonist and family
  • RELEASE: PEN Guild Heads to Arbitration Today Over POLITICO’s AI Violations
  • Post-Gazette Lawyer Argues Against PG Reporting — and facts — in Bizarre 3rd Circuit Court Appearance
  • Newsletter: Boss faces contempt charges.
  • City Bureau workers announce union drive with unanimous support

Connect

  • The NewsGuild-CWA
  • 501 Third St., NW, 6th floor
  • Washington, DC 20001-2797
  • guild@cwa-union.org
  • 202-434-7177

About us

  • About
  • Members
  • Leadership
  • Staff
  • Locals
  • History

Resources

  • NewsGuild Constitution
  • Executive Council Minutes
  • CWA Constitution
  • CWA homepage
  • O-1B Visa Request
  • IFJ Press Cards
  • Privacy Policy

Campaigns

  • Pay Equity
  • Save The News
  • Collective Bargaining
  • Combatting Sexual Harassment
© The NewsGuild-CWA
  • Facebook
  • Twitter
  • Instagram
  • Bluesky